1. Step 1

Set up your string line

2. Step 2

Cut the first top strip in half, attach to the first rail and fit joint clips

3. Step 3

Place spots of bedding mortar on the sub-base at intervals of 800mm to correspond with holes in the base

4. Step 4

Place the rail on the bed and gently tap down with a rubber mallet until the top of the wear strip is at the desired level

5. Step 5

Place bedding for next rail as in step 3

6. Step 6

Join the second rail to the first with the joint clips

7. Step 7

Fit the full length of the top strip across rails

8. Step 8

Tap down the rail as in step 4

9. Step 9

Each 3m K-Form rail has pre drilled 24mm holes for dowel bars

10. Step 10

Once the bedding mortar has cured you can start pouring concrete

11. Step 11

K-Form rails stay in place, therefore adjoining bays can be poured one after the other

12. Step 12

Once the concrete has cured, the top strip can either be left in place or removed. The gap can subsequently be filled with a joint sealant

Visit K-Form UK Visit K-Form USA Visit K-Form South Africa Visit K-Form India Visit K-Form Australia Visit K-Form Czech Republic Visit K-Form France